Ceritified
ISO 9001:2008
More than 90
#1 Key Projects in Iraq
Number #1
Construction in region
Get A Quote

WELL-PADS & ASSOCIATED CONCRETE WORKS

Depending on its capabilities and resources, Al-Rand Group can achieve any special request related to civil and constructional works in the oil fields.

Al-Rand Group has the ability to build and install crude oil loading stations, provides all necessary materials and equipment needed, as well as building and casting oil wells’ foundations, well pads and any mechanical and electrical works related to this domain.

Our company cares about studying the proper conditions for implementation, so that we can execute all the projects and guarantee the high-quality and due time, no matter how environmental conditions was, and according to the international standards and the vision of our oil companies’ clients.

DRILLING WELL PREPARING SERVICE

Once the site has been selected, the crew survey the area to determine its boundaries, Al-Rand Group crew goes about preparing the land:

  • Clearing and leveling rig land, and build the access roads.
  • Drilling a water well, because water is used in drilling.
  • Digging a reserve pit, which is used to dispose of rock cuttings and drilling mud during the drilling process, or disposed of offsite — trucked away instead of placed in a pit.
  • Build foundation to support a rig
  • Power system: set large diesel engines – burn diesel-fuel oil to provide the main source of power, set electrical generators – powered by the diesel to provide electrical power
  • Mechanical system.